4.5 Quality conformance tests. Quality conformance tests shall be divided as follows
a. Individual Tests (4.5.1)
b. Sampling plan and tests (4.5.2)
=For follow-on production specific tests are required to verify quality conformance and the test results shall be compared to match the test results established by the frst article tests.
4.5.1 Individual Tests. Each jack shall be subjected to the following tests as defined in 4.6.
a . Visual examination of the jack (4.6.1)
b. Pressure and leakage plus bypass valve tests (4.6.3.1 and 4.6.3.3)
4.5.2.1 Periodic sampling. Five jacks shall be selected at random from every 50 or fraction thereof produced and subjected to the static-proof test described in 4.6.4, the settling test (4.6,3.2), and the safety device test (4.6.3.4).
4.5.2. 1.1 Rejection and retest. When an item selected from a production run fails to meet the specification, no items still on hand or later produced shall be accepted until the extent and cause of failure have been determined and appropriately corrected. The contractor shall explain to the Government representative the cause of failure and the action taken to preclude recurrence. After correction, all of the tests shall be repeated.
4.5.2. 1.2 Individual tests may continue. As a part of the production program, individual tests may be continued pending the investigation of a sampling test failure. But final acceptance of the items on hand or items produced later shall not be made until it is determined that all items meet all the requirements of the specification.
4.5.3 Defects in items already accepted. The investigation of a test failure could indicate that defects may exist in items already accepted. If so, the contractor shall fully advise the procuring activity of all the
defects likely to be found and the method of correcting them.
4.6 Examinations and test methods.
4.6.1 Examination of product. The jack shall be inspected to determine compliance with the requirements specified herein with respect to materials, workmanship, and marking, The jack shall be compleltely assembled in each configuration for examination.