MIL-M-4871C(USAF)
Sampling Procedures And Tables For
MIL-STD-105
Inspection By Attributes
Marking For Shipment And Storage
MIL-STD-129
Identification Marking Of U.S. Military
MIL-STD-130
Property
Standards And Specifications, Order Of
MIL-STD-143
Precedence For The Selection Of
Materials Handling Equipment, Preparation For
MIL-STD-162
Shipment, Storage, Cyclic Maintenance, Routine
Testing And Process
Part And Equipment Procedures For Packaging
MIL-STD-794
And Packing Of
Finish, Materials And Processes For Corrosion
MIL-STD-808
Preventive And Control in Support Equipment
Test Reports, Preparation For
MIL-STD-831
Cushioning, Anchoring, Bracing, Blocking, And
MIL-STD-1186
Waterproofing, With Appropriate Test Methods
2.1.2 Other Government documents, drawings, and publications. The following
other Government documents, drawings, and publications form a part of this
specification to the extent specified herein.
DRAWING S
Air Force
Maintenance Platform Assembly, Aircraft, Type B-3
53J21491
Wiring Diagram - Aircraft Maintenance Platform
56J6283
Schematic
Electric Cable - Aircraft Maintenance Platform,
56J6284
Installation Of
Hydraulic System - Aircraft Maintenance Plat-
56J6291
form, Installation Of
* (Copies of specifications and standards required by manufacturers in con-
nection with specific acquisition functions should be obtained from the
contracting activity or as directed by the contracting officer.)
2.2 Other publications. The following document(s) form a part of this
specification to the extent specified herein. The issues of the documents
which are indicated as DoD adopted shall be the issue listed in the current
DoDISS and the supplement thereto, if applicable.
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
Standard Practice for Commercial Packaging.
ASTM D 3951
(Application for copies of ASTM publications should be addressed to the
American Society for Testing and Materials, 1916 Race Street, Phila PA 19103.)
2.3 Order of precedence. In the event of a conflict between the text of
this specification and the references cited herein, the text of this specifi-
cation shall take precedence.
REQUIREMENTS
3.
3.1 First article. When specified, the contractor shall furnish a complete
maintenance platform for first article inspection in accordance with 4.2
(see 6.3). The first article shall be identical with the proposed production
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business